国产成人精品综合久久久久性色,继母的拖油瓶是我的前女友动漫,欧美精品乱码99久久蜜桃,精品国产自在天天线2019

歡迎進入山東恒能環(huán)保能源設備有限公司

熱線電話

0531-69953988

分類導航
產品展示
聯(lián)系我們
山東恒能環(huán)保能源設備有限公司

聯(lián)系電話:18678860671

服務熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿易試驗區(qū)濟南片區(qū)孫村街道經(jīng)十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

沼氣凈化脫硫裝置的運行維護!

沼氣凈化裝置的運行維護應符合下列規(guī)定:

The operation and maintenance of biogas purification device shall meet the following requirements:
1、應定期排出脫水、脫硫裝置中的領凝水。當室外溫度接近0℃時,應每天排除冷凝水,排水時應防止沼氣泄漏。
1. The condensate water in dehydration and desulfurization unit shall be discharged regularly. When the outdoor temperature is close to 0 ℃, the condensate water should be drained every day, and the leakage of biogas should be prevented during drainage.
2、生物脫硫啟動運行正常后,應定期檢查脫硫前后硫化氫濃度變化,硫化氫去除率應滿足后端工藝要求。當發(fā)現(xiàn)脫硫效率明顯下降時,應及時補充循環(huán)營養(yǎng)液。塔內填料應6-12個月清洗1次。
2. After the start-up and operation of biological desulfurization are normal, the change of hydrogen sulfide concentration before and after desulfurization should be checked regularly, and the hydrogen sulfide removal rate should meet the requirements of back-end process. When it is found that the desulfurization efficiency is obviously decreased, the circulating nutrient solution should be supplemented in time. The packing in the tower should be cleaned once every 6-12 months.
3、應定期檢查干法脫硫塔前后硫化氫濃度、沼氣壓力變化,當達不到設計要求時應更換脫硫劑或進行脫硫再生。
3. The change of hydrogen sulfide concentration and biogas pressure before and after the dry desulfurization tower should be checked regularly. When the design requirements are not met, the desulfurizer should be replaced or the desulfurization regeneration should be carried out.
                       沼氣脫硫
4、干法脫硫塔再生應符合下列規(guī)定:
4. Regeneration of dry desulfurization tower shall meet the following requirements:
1).當采用塔內脫硫劑再生時,應關閉沼氣進出口閥,打開旁通管道和放散管路閥門。
1) When the desulfurizer in the tower is used for regeneration, the inlet and outlet valves of biogas should be closed, and the valves of bypass pipeline and discharge pipeline should be opened.
2).當采用在線脫硫劑再生時,應根據(jù)沼氣中硫化氫含量確定空氣摻混量及空氣流速,塔內溫度應低于70℃,脫硫塔出口處沼氣中氧含量應小于1%;
2) When online desulfurizer regeneration is used, the air mixing amount and air flow rate should be determined according to the content of hydrogen sulfide in biogas. The temperature in the tower should be lower than 70 ℃, and the oxygen content in biogas at the outlet of desulfurization tower should be less than 1%;
3).脫硫劑進行2次~3次再生后應及時更換,更換脫硫劑時操作人員應戴防毒面具,室內應進行通風;
3) The desulfurizer should be replaced in time after 2 ~ 3 times of regeneration. When replacing the desulfurizer, the operators should wear gas masks, and the room should be ventilated;
4).廢脫硫劑的處置應符合環(huán)境保護的要求。
4) The disposal of waste desulfurizer should meet the requirements of environmental protection.

相關產品 我們的存在,是為了更好的服務于沼氣等可燃氣體凈化及利用行業(yè)
大香煮伊区一二三四区2021| 成品人直播app下载| 中文资源在线官网| 浴室里强摁做开腿呻吟的漫画 | 精品夜夜爽欧美毛片视频| 妇与子乱肉肉视频| 国产成人午夜精品久久久久久 | 国产老师色诱我好爽在线观看| 高H短篇辣肉各种姿势自慰H| 国产综合一区二区三区| 国产精品无码久久综合| 国产av麻豆mag剧集| japanese熟女俱乐部| 久久久噜噜噜www成人网| 玩弄放荡人妻少妇系列视频| 色偷偷888欧美精品久久久| 美国专线欧洲专线日本专线| 国内永久免费的CRM| 亚洲综合无码一区二区| AV免费网址在线观看| 国产精品va最新国产精品视频| 粉红理论泰剧| aaa级久久久精品无码片| 欧美综合自拍亚洲综合图片区| 国产精品国产精品国产专区不卡| 女女同性女同色情在线电影| 久久精品人妻一区二区蜜桃| 丁香花在线观看视频在线| 中文字幕人妻丝袜美腿乱| 40岁成熟女人牲交片20分钟| 又色又爽又高潮免费视频观看| 思思99re6国产在线播放| 亚洲性av免费| 泰国美女68283精品人体| 粗大紫黑用力噗哧BL军人| 学生16女人毛片免费视频| 灯草和尚在线观看| 欧美猛交xxx无码黑寡妇| 天天操天天干| 国产午夜精品一区二区三区漫画| 婷婷国产成人精品视频小说|