国产成人精品综合久久久久性色,继母的拖油瓶是我的前女友动漫,欧美精品乱码99久久蜜桃,精品国产自在天天线2019

歡迎進(jìn)入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿(mào)易試驗(yàn)區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號(hào)章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號(hào)樓 101

沼氣脫碳法是為了達(dá)成什么效果?

1. 連接氣源:

1. Connect the air source:
接通電源,調(diào)節(jié)減壓閥至0.4 ~ 0.6MPa,檢查系統(tǒng)有無漏氣。然后試運(yùn)行以下動(dòng)作:(1)泵舉升(2)a泵充氣(3)B泵舉升(4)B泵充注。注:升降油缸升降時(shí),若兩個(gè)油缸不同步,請(qǐng)降至原點(diǎn)重新操作。
Connect the power supply, adjust the pressure reducing valve to 0.4~0.6MPa, and check if there is any air leakage in the system. Then try the following actions: (1) Pump lift (2) Pump a inflate (3) Pump B lift (4) Pump B charge. Note: If the two oil cylinders are not synchronized during the lifting and lowering of the oil cylinder, please lower it to the origin and operate again.
2. 將部件a、B的膠筒放到位,并與橡膠泵a、B的軸線對(duì)齊。
2. Place the rubber cylinders of components A and B in position and align them with the axis of rubber pumps A and B.
以A組分為例
Taking component A as an example
1)操作手動(dòng)轉(zhuǎn)閥將a泵舉升到較高的氣動(dòng)雙組份點(diǎn)膠機(jī),觀察舉升過程中管路拉伸是否過緊。
1) Operate the manual rotary valve to lift pump A to a higher pneumatic two-component dispensing machine, and observe whether the pipeline tension is too tight during the lifting process.
2)將膠桶置于a泵壓板下,打開雙組份膠桶附件,將膠袋從桶內(nèi)翻出,取出膠面塑料片。
2) Place the rubber bucket under the pressure plate of pump A, open the two-component rubber bucket attachment, flip the rubber bag out of the bucket, and take out the plastic sheet on the rubber surface.
沼氣提純
3)使泵的壓板緩慢下降。壓力板進(jìn)入筒體時(shí),應(yīng)與筒體開口對(duì)準(zhǔn)。打開壓板的排氣口,直至壓板與橡膠表面接觸。當(dāng)壓板內(nèi)氣體完全排出,排氣口有少量膠水溢出時(shí),排氣閥可關(guān)閉(升降開關(guān)仍處于下壓狀態(tài))
3) Slowly lower the pressure plate of the pump. When the pressure plate enters the cylinder, it should be aligned with the opening of the cylinder. Open the exhaust port of the pressure plate until it comes into contact with the rubber surface. When the gas inside the pressure plate is completely discharged and a small amount of glue overflows from the exhaust port, the exhaust valve can be closed (the lifting switch is still in the downward pressure state)
4)開機(jī)試膠:打開主泵氣源開關(guān),按膠槍開關(guān),直至泵a內(nèi)空氣完全排出,膠口不斷排出。
4) Start up glue test: Turn on the main pump air source switch, press the glue gun switch, until the air in pump a is completely discharged, and the glue port continues to discharge.
用同樣的方法操作泵B。
Operate pump B using the same method.
4. 上膠操作:
4. Gluing operation:
1)松開比例桿上比例泵的鎖緊螺桿,將比例泵的內(nèi)外調(diào)節(jié)到所需比例。只有當(dāng)膠水a(chǎn)和膠水B的比例達(dá)到正常值時(shí),才能進(jìn)行以下操作。
1) Loosen the locking screw of the proportional pump on the proportional rod and adjust the inside and outside of the proportional pump to the desired ratio. The following operations can only be carried out when the ratio of glue a to glue B reaches the normal value.
2) a和B泵設(shè)置選擇旋鈕,使噴膠槍的退出與中間縫的兩塊玻璃,打開開關(guān)噴膠槍,把膠槍順利在適當(dāng)?shù)乃俣忍畛涞碾p組分膠玻璃罐。涂膠結(jié)束時(shí)關(guān)閉膠槍。
2) Set the selection knobs for pumps A and B to allow the exit of the glue gun and the two pieces of glass in the middle seam. Turn on the switch of the glue gun and smoothly fill the two-component glue glass jar with the glue gun at an appropriate speed. Turn off the glue gun at the end of gluing.
5. 更換膠筒:
5. Replace the rubber cylinder:
1)當(dāng)桶內(nèi)膠水用完時(shí),應(yīng)立即關(guān)閉a、B開關(guān),停止輕敲。
1) When the glue in the bucket is used up, immediately turn off the A and B switches and stop tapping lightly.
2)打開a(或b)橡膠泵的充氣開關(guān),將a(或b)橡膠泵的升降機(jī)構(gòu)選為上升位置,按下旋鈕,使壓力板緩慢升降。此時(shí)要注意的是膠筒盡量不要離開底盤,待壓板與膠筒完全分離后,關(guān)閉a(或b)膠泵的充氣開關(guān)。3)取出空桶,將新的膠桶放在工作位置,重復(fù)第3、4、4項(xiàng)的操作。
2) Turn on the inflation switch of the a (or b) rubber pump, select the lifting mechanism of the a (or b) rubber pump as the rising position, press the knob to slowly raise and lower the pressure plate. At this point, it should be noted that the rubber cylinder should not leave the chassis as much as possible. After the pressure plate is completely separated from the rubber cylinder, turn off the inflation switch of the a (or b) rubber pump. 3) Take out the empty bucket, place the new rubber bucket in the working position, and repeat the operations of items 3, 4, and 4.
1. 膠槍:由于雙組份膠水是由兩種膠水混合而成,其凝固速度與環(huán)境溫度及a、B膠水的配比有關(guān),混合后的膠水在20分鐘內(nèi)反應(yīng)固化。因此,設(shè)備在正常上膠時(shí),如果20分鐘內(nèi)未使用,就要把混好的膠洗掉,以免堵塞混膠機(jī)和膠槍。具體操作:關(guān)閉B泵,打開B回膠開關(guān),再打開膠槍,直到膠條變白為止。
1. Glue gun: As two-component glue is a mixture of two types of glue, its solidification rate is related to the ambient temperature and the ratio of A and B glue. The mixed glue will react and solidify within 20 minutes. Therefore, when the equipment is glued normally, if it is not used within 20 minutes, the mixed glue should be washed off to avoid blocking the glue mixer and glue gun. Specific operation: Turn off pump B, turn on the B glue return switch, and then turn on the glue gun until the glue strip turns white.
感謝您的閱讀,此文的文章來源:雙組份打膠機(jī)更多的內(nèi)容和問題請(qǐng)點(diǎn)擊:http://www.jncsjx.com我們會(huì)繼續(xù)努力的為您提供服務(wù),感謝您的支持!
Thank you for reading. The source of this article is the two-component gluing machine. For more information and questions, please click: http://www.jncsjx.com We will continue to work hard to provide you with services. Thank you for your support!

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
大胆欧美人体艺术| 18以下岁禁止1000部免费| 久久人人爽人人爽人人片Ⅴ| 青青草国产成人99久久| 亚洲欧美精品午睡沙发| 玩弄朋友娇妻呻吟交换电影| 成人电影在线播放| AV无码人妻一区二区三区牛牛| 在教室伦流澡到高潮h| 日本三级片在线观看| xxoo电影| 女人高潮的24种图片| 捆绑白丝粉色jk震动捧喷白浆| 二人扑克剧烈运动视频教程| 巨胸不知火舞露双奶头无遮挡| 欧美裸体xxxx极品少妇| 国产又硬又粗进去好爽a片软件| 热の综合热の国产中文网| 无码av久久久久久久久| 夜夜精品无码一区二区三区| 二人扑克剧烈运动视频| 国产精品成熟老女人| yin荡娇妻乱部分阅读| 亚洲成av人片在线观看天堂无码| А√天堂中文在线官网 | 浪荡货老子大吗爽死你h漫画男男| 车后座挺进朋友人妻女友| 精品久久久久久久中文字幕| 超薄丝袜足j好爽在线观看| 午夜a成v人电影| 久久久久亚洲AV成人网人人软件 | 军人全身脱精光自慰| 日本少妇bbw丰满做爰图片| 日本护士吞精囗交gif| 国产精品无码一区二区在线看| 黑人与人妻出轨系列| 国精产品一区一区三区糖心| 久久久久久综合网天天| jzzijzzij亚洲成熟少妇| 国模裸体无码XXXX视频| 无人区一线二线三线乱码|