国产成人精品综合久久久久性色,继母的拖油瓶是我的前女友动漫,欧美精品乱码99久久蜜桃,精品国产自在天天线2019

歡迎進(jìn)入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿(mào)易試驗區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

生物脫硫系統(tǒng)操作規(guī)程要注意什么!

一:系統(tǒng)運行前檢查

1: System pre-operation inspection
1:檢查沼氣流經(jīng)系統(tǒng)的各閥門控制情況,開和關(guān)要到位。
1: Check the control of each valve of the biogas flow through the system, and ensure that the opening and closing are in place.
2:檢查循環(huán)水管路上的閥門正確使用情況。
2: Check the correct use of valves on the circulating water pipe.
3:檢查各儀表,儀器是否完好,有無漏氣、漏水存在,能否正常運行。
3: Check whether all instruments are in good condition, whether there is air or water leakage, and whether they can operate normally.
4:檢查每個用水點水位,系統(tǒng)嚴(yán)禁缺水運行。
4: Check the water level of each water point, and the system is strictly prohibited from running without water.
二:運行中注意事項
2: Precautions during operation
1:設(shè)備啟動前在控制柜觸屏上要確定與之相對應(yīng)的設(shè)備按鍵。
沼氣脫硫
1: Before the equipment is started, the corresponding equipment keys shall be determined on the touch screen of the control cabinet.
2;循環(huán)水泵開啟后,應(yīng)觀察水泵是否上水,壓力表正常穩(wěn)定。
2; After the circulating water pump is started, observe whether the water pump is filled with water and whether the pressure gauge is normal and stable.
3:各設(shè)備啟動后,注意機(jī)器聲音、電流、振動情況、溫度、螺絲是否松動。
3: After the equipment is started, pay attention to the sound, current, vibration, temperature and looseness of screws.
4:每天按時用手持式檢測儀測生物脫硫后H2S三--四次。
4: Use hand-held detector to measure H2S after biological desulfurization three to four times every day.
5:營養(yǎng)鹽計量泵,氫氧化鈉潛污泵24小時應(yīng)有正常工作水位,兩桶加水時不要讓液體溢出桶外。
5: The nutrient salt metering pump and the sodium hydroxide submersible sewage pump should have the normal working water level within 24 hours. Do not allow the liquid to overflow when adding water to two buckets.
6:曝氣池水溫控制在32℃-35℃,堿法脫硫PH值控制在8-8.5之間,氧化還原電位在-320—-260mv之間。
6: The water temperature of the aeration tank is controlled at 32 ℃ - 35 ℃, the PH value of alkali desulfurization is controlled between 8-8.5, and the redox potential is controlled between - 320 - 260mv.
三:維護(hù)保養(yǎng)
3: Maintenance
1:每天將系統(tǒng)內(nèi)冷凝水排水閥放空。
1: Vent the condensate drain valve in the system every day.
2:嚴(yán)格執(zhí)行交接班制度,并做好設(shè)備安全運行記錄、各項指標(biāo)參數(shù)記錄。
2: Strictly implement the shift handover system, and make records of the safe operation of the equipment and various indicators and parameters.
3:定期對設(shè)備除塵,潤滑,防銹(一個月一次),保持環(huán)境干潔。
3: Regularly dust, lubricate and rust the equipment (once a month) to keep the environment dry and clean.
4:每天往洗氣水箱注水15分鐘,達(dá)到臟水置換作用,一個月整體換一次水。
4: Fill the gas washing tank with water for 15 minutes every day to replace dirty water, and change the water once a month.
本文由沼氣脫硫提供技術(shù)支持,更多的詳細(xì)精彩內(nèi)容請點擊我們的網(wǎng)站 http://m.ydjdys.com我們將會全心全意為您提供滿意的服務(wù)。
This article is supported by biogas desulfurization technology. For more details, please click our website http://m.ydjdys.com We will wholeheartedly provide you with satisfactory service.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
国产AV亚洲精品久久久久| 狠狠色噜噜狠狠狠狠色综合久| 色天天天综合色天天| 国产98色在线 | 日韩| 国产精品videossex久久发布| 国精品人妻无码一区二区三区牛牛| 国产精品久久久久这里只有精品| 13小男生gay自慰脱裤子| 被男狂揉吃奶胸60分钟视频| 国产手机拍视频推荐2023| 92午夜少妇极品福利无码电影| 樱花草视频在线观看免费高清| 亚洲国产精品无码久久九九大片| 男生下面伸进女人下面的视频| 女人夜夜春高潮爽a∨片传媒 | 国产乱视频在线观看| 金瓶梅杨思敏| 在线日本v二区不卡| 欧美xxxx做受欧美| 躺着把jiji向上摁平然后揉搓| 综合图区亚洲欧美另类图片| 全是肉的高h短篇bl| 日韓無碼亞洲美女成人片| 少妇被又大又粗又爽毛片欧美| 国产AV亚洲精品久久久久| 善良的妺妺hd高清中文| 欧美白人最猛性xxxxx| 鬼父在线视频观看| 丰满乳乱亲伦小说| 又大又粗又硬又长| 多人交free性glasses| 亚洲砖码砖专无区2023| 夜里十大禁用软件APP入口| 久久久99久久久国产自输拍| 成人免费a级毛片无码片2022| 花蝴蝶免费视频直播高清版 | 永久免费AV无码入口国语片| 欧美精品色情特级a片| 国产熟女高潮视频| 欧美学生小嫩嫩xb| 撕开丝袜美腿麻麻扛肩上|